Kelantan
Client
Damakmur Sdn Bhd
Scopes & Innovations
BIM Execution Plan
Level of Development Specification for Infrastructure
Lead BIM Coordinator (design to as-built) LOD 100-500
BIMASIA Codeset for Civil3D
BIM Family and Subassemblies
As built model based on SKATA
Extensive use of 4D simulation to reduce construction duration and cost
BIM model used for traffic management, traffic & flood analysis, impact study on cadastral lot
Status
Design Stage
Description
Design and Construction of an upgrading existing works (1.4 km) from 2 lane two way to 4 lane two way road based in the JKR U5 standard. The first and benchmark BIM Level 2 Infrastructure project for JKR.


