Notice: Uninitialized string offset: 0 in C:\Domains\bimasiac\bimasia.com.my\wwwroot\wp-includes\template.php on line 1

Notice: Uninitialized string offset: 0 in C:\Domains\bimasiac\bimasia.com.my\wwwroot\wp-includes\template.php on line 1

Notice: Uninitialized string offset: 0 in C:\Domains\bimasiac\bimasia.com.my\wwwroot\wp-includes\post-template.php on line 1

Notice: Uninitialized string offset: 0 in C:\Domains\bimasiac\bimasia.com.my\wwwroot\wp-includes\post-template.php on line 1

Notice: Uninitialized string offset: 0 in C:\Domains\bimasiac\bimasia.com.my\wwwroot\wp-includes\rest-api\endpoints\class-wp-rest-terms-controller.php on line 1

Notice: Uninitialized string offset: 0 in C:\Domains\bimasiac\bimasia.com.my\wwwroot\wp-includes\rest-api\endpoints\class-wp-rest-terms-controller.php on line 1

Notice: Uninitialized string offset: 0 in C:\Domains\bimasiac\bimasia.com.my\wwwroot\wp-includes\style-engine\class-wp-style-engine.php on line 1

Notice: Uninitialized string offset: 0 in C:\Domains\bimasiac\bimasia.com.my\wwwroot\wp-includes\style-engine\class-wp-style-engine.php on line 1

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the tpebl domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in C:\Domains\bimasiac\bimasia.com.my\wwwroot\wp-includes\functions.php on line 6114
MRT City Masterplan, Kuala Lumpur – BIMASIA Sdn Bhd

Sultan Ibrahim Power Plant, Johor​

Client
3D Architecture for MRT Corporation

Description
The Concept Masterplan for MRT Sungai Buloh-Kajang (MRT SBK) and Sungai Buloh- Serdang-Putrajaya (MRT SSP) lines. MRT City masterplan is about a vision of a Linear City to unlock potential and encourage social and economic growth of its context towards and beyond 2020 through urban reactivation, identity creation and lifestyle enhancement. 5 key Identities – City Centre, Commercial, Transit, Community and Edutech were created to be the themed destinations based on physical, cultural and heritage aspects of the context surrounding 26 stations along these development corridors

Scopes & Innovations
LOD 100 BIM Modelling for 450m radius surrounding the 26 MRT Stations

Status
Completed 2017