Notice: Uninitialized string offset: 0 in C:\Domains\bimasiac\bimasia.com.my\wwwroot\wp-includes\template.php on line 1

Notice: Uninitialized string offset: 0 in C:\Domains\bimasiac\bimasia.com.my\wwwroot\wp-includes\template.php on line 1

Notice: Uninitialized string offset: 0 in C:\Domains\bimasiac\bimasia.com.my\wwwroot\wp-includes\post-template.php on line 1

Notice: Uninitialized string offset: 0 in C:\Domains\bimasiac\bimasia.com.my\wwwroot\wp-includes\post-template.php on line 1

Notice: Uninitialized string offset: 0 in C:\Domains\bimasiac\bimasia.com.my\wwwroot\wp-includes\rest-api\endpoints\class-wp-rest-terms-controller.php on line 1

Notice: Uninitialized string offset: 0 in C:\Domains\bimasiac\bimasia.com.my\wwwroot\wp-includes\rest-api\endpoints\class-wp-rest-terms-controller.php on line 1

Notice: Uninitialized string offset: 0 in C:\Domains\bimasiac\bimasia.com.my\wwwroot\wp-includes\style-engine\class-wp-style-engine.php on line 1

Notice: Uninitialized string offset: 0 in C:\Domains\bimasiac\bimasia.com.my\wwwroot\wp-includes\style-engine\class-wp-style-engine.php on line 1

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the tpebl domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in C:\Domains\bimasiac\bimasia.com.my\wwwroot\wp-includes\functions.php on line 6114
TNB GENCO – BIMASIA Sdn Bhd

Sultan Ibrahim Power Plant, Johor​

Client
TNB Genco

Description
BIM Consultancy services to further enhance TNB Genco’s BIM implementation to achieve better efficiency towards brighter performance in power generation and related business. Assisted in the development of TNB Genco BIM transformation strategy, BIM documents, BIM competency / capability building among TNB Genco-BIM Task Force team, findings and recommendations for BIM implementation. The visions are for TNB Genco to have Digital Twin for all assets and capable to provide BIM expertise in power plant to external parties in 2027 and beyond.

Scopes & Innovations
Gap Analysis
BIM Roadmap
Organizational Information Requirements (OIR)
Asset Information Requirements (AIR)
Exchange Information Requirements (EIR)
BIM Execution Plan (BEP) template
BIM presentation slide

Status
Completed December 2022